Waste Incineration Plant Bolzano

Bolzano/South-Tirol

Planning, construction and turnkey delivery of the Municipality of Bolzano’s waste incineration plant at Bolzano, including the implementing with optimization and systems guidance up to delivery. The plant consist of one incineration line and includes the supply and execution of the waste incineration furnace, the heat recovery boiler, the thermic cycle, the flue gas purification plant as well as relevant construction works.

Hard Facts
  • Capacity: 180.000 t/year