Construction of the district heating station with heat energy coupling of Lana, first and second contract section, carried out by the consortium with the company Marx SpA, Costruzioni edili stradali, from Silandro (BZ). Delivery and installation of the district heating grid of Untermais, Merano, including the overall excavation and underground engineering, complete with heat transfer stations and accessories with an overall length of 6.000 lm. Turnkey delivery, installation, technical approval as well as 6-year commissioning and maintenance of the new energy and district heating station, complete with accessories. Gas turbine for heat energy coupling and heat boiler for steam and hot water production. DH station complete with auxiliary and reserve boiler and accessories.
Electrical capacity: 6.000 kWe
Steam capacity: 4.500 kWth
Thermal power station: 19.000 kWth
Pipe system: Socotherm - Isoplus