District Heating Net Torino

Torino/Piemonte

Construction of the pipe’s section pre-insulated district heating network for the city of Turin, North-East Area.
Supply and laying of pipes DN 600/800 and all ancillary works for a total of about 100 ml. pipe near the underpass at the intersection of power and C.so C.so Mortara, including excavation, restoration and embankments.
Construction of calibre 700 main leads and distributors, including excavation work and additional accessories, with an overall length of 30.300 m.
Supply, installation and commissioning of a district heating station integrated with a line main of calibre 700/900, including excavation and underground engineering, with an overall length of 2.000 m
a) Thermo-hydraulic Equipment:
Supply and installation of 99 heat transfer stations as well as accessories and connection to the sole recipient.
b) District Heating System:
Supply, installation and commissioning of a district heating system in the ALFA zone, main lead with a calibre of 500/710, in the quarters “LE VaLLETTE”, “CASTELGOMBERTO-MIRAFIORI”, “BARICENTRO TERMICO N. 54” including excavation and underground engineering, with an overall length of 17.135 m.

Hard Facts

Tube type:  ZPUM; SOCOLOGSTOR; ABB–MØLLER
Warning system:  Brandes; Nordisch, CWA