Realization of a new Up-flow Anaerobic Sludge Blanket tratment plant for the pretreatment of the WW of VOG PRODUCTS - Association of South Tyrolean Fruit Growers’ Cooperatives . The system handles 21.000 kg CSB/day and produces 220 m³/h Biogas (560 kWel).
The work includes the installation of 2 anaerobic reactors and the periphery. In addition 2 new high performance gas engines (output 280 kW) and a new biogas actuator.